wTrakLogoHdr3p0a.jpg (30979 bytes)
4x144.gif (69 bytes)
4x16.gif (54 bytes) wTrak_Cover_2p5a.jpg (43417 bytes)

Staging Switchyard
4x150.gif (70 bytes)

9x900.gif (184 bytes)
4x144.gif (69 bytes)
introduction
standardModules
expansionModules
advancedModules
turntableSwitchyard
stagingSwitchyard
reroutingEndyard
expertModules
accessoryModules
otherModules
resourcesAndLinks
4x16.gif (54 bytes) 4x20.gif (55 bytes)This is a challenging segment to construct and navigate. Particularly useful for assembling trains to navigate through the table, it can serve as a start and finish point.

4x20.gif (55 bytes)Place lights underneath the elevated tracks to add depth and focus. Signal lights could also be incorporated. Scrub brush, piles of discarded rail, retaining wall, dust, dirt, coal, fence - features on this segment could be dark and spare. A signal tower and repair shed would be appropriate too.

stagingSwitchyardPage.jpg (36036 bytes)

9x40.gif (64 bytes)
lwrBorder.gif (1657 bytes)